Set Up
  • • Plan to have 10,000m2
  • • 6 rigging points + 1 central rigging point
  • • 7 techniques
  • • Able to provide 360 degree, glare free light.
  • • 1 day for the set up +1 day for inflation and prelight + 7 day of the job
Electrical needs
  • • Ballon: 12 lamps of 4K KMI= 4.8KW
  • • 4 winches = 4*2 kk@= 8.8k@
  • • Others = 10kW
Electrical needs
  • • 6 winches of 1.200kg each (120*90cm)
  • • Locker of 1.000kg (130*30cm)
  • • 2*1.000kg of ballast sandbags (120*90cm)
  • • 4 palboxes (120*100cm)
  • • Enveloper + hamees: 300kg
  • • Electrical Supply
  • • 12 ballasts of 4k@
  • • Helium: 650m3
Lighting
  • • 500 lux under the balloon / 100 lux at 50m